dc.contributor.author | Lenort, Radim | |
dc.contributor.author | Klepek, Roman | |
dc.contributor.author | Samolejová, Andrea | |
dc.date.accessioned | 2012-01-19T09:34:27Z | |
dc.date.available | 2012-01-19T09:34:27Z | |
dc.date.issued | 2012 | |
dc.identifier.citation | Metalurgija. 2012, g. 51, br. 2, s. 225-228. | cs |
dc.identifier.issn | 0543-5846 | |
dc.identifier.issn | 1334-2576 | |
dc.identifier.uri | http://hdl.handle.net/10084/89844 | |
dc.description.abstract | The paper presents a heuristic algorithm for planning and scheduling of forged pieces heat treatment which allows
maximizing the capacity exploitation of the heat treatment process and the entire forging process. Five Focusing
Steps continuous improvement process was selected as a methodological basis for the algorithm design. Its application
was supported by simulation experiments performed on a dynamic computer model of the researched process.
The experimental work has made it possible to elicit the general rules for planning and scheduling of the heat
treatment process of forged pieces which reduce losses caused by equipment conversion and setup times, and
which increase the throughput of this process. The HIPO diagram was used to design the algorithm. | cs |
dc.format.extent | 368629 bytes | cs |
dc.format.mimetype | application/pdf | cs |
dc.language.iso | en | cs |
dc.publisher | Hrvatsko Metalurško Društvo | cs |
dc.relation.ispartofseries | Metalurgija | cs |
dc.relation.uri | http://hrcak.srce.hr/file/111121 | cs |
dc.subject | forged pieces | cs |
dc.subject | heat treatment | cs |
dc.subject | planning and scheduling | cs |
dc.subject | 5FS continuous improvement process | cs |
dc.subject | dynamic simulation | cs |
dc.subject | otkivci | cs |
dc.subject | toplinska obrada | cs |
dc.subject | planiranje i terminiranje | cs |
dc.subject | 5FS kontinuirano poboljšanje procesa | cs |
dc.subject | dinamička | cs |
dc.title | Heuristic algorithm for planning and scheduling of forged pieces heat treatment | cs |
dc.title.alternative | Heuristički algoritam za planiranje i terminiranje toplinske obrade otkivaka | cs |
dc.type | article | cs |
dc.identifier.location | Není ve fondu ÚK | cs |
dc.description.abstract-en | U radu je predstavljen heuristički
algoritam za planiranje i terminiranje toplinske obrade otkivaka i koja omogućava maksimalno iskorištavanje kapaciteta
procesa toplinske obrade i cijelog proizvodnog procesa kovanja. Metoda Pet koraka fokusiranja za kontinuirano
poboljšanje procesa je odabrana kao metodološka osnova za kreiranje algoritma. Njegova primjena je
podržana simulacijom eksperimenata koja se izvodi na dinamičkom računalnom modelu za istraživanje procesa.
Simulacija eksperimenta je omogućila da se mogu izvesti opća pravila za planiranje i terminiranje procesa toplinske
obrade otkivaka koji smanjuju gubitke uzrokovane opremom i vremenskim planiranjem, a povećavaju propusnost
tog procesa. Hijerarhijski dijagram planiranja i terminiranja procesa je korišten za izradu algoritma. | cs |
dc.rights.access | openAccess | |
dc.type.version | publishedVersion | |
dc.type.status | Peer-reviewed | cs |
dc.description.source | Web of Science | cs |
dc.description.volume | 51 | cs |
dc.description.issue | 2 | cs |
dc.description.lastpage | 228 | cs |
dc.description.firstpage | 225 | cs |
dc.identifier.wos | 000297897500019 | |